Our New Centre

Our New Centre

A purpose-built home for long-term care and community health services, with public updates at every stage.

Strategic priority

Status: in construction

Site preparation is complete and construction is under way. Opening dates are not yet confirmed.

Overview

Where the project stands

St. Anne is being replaced by a purpose-built, approximately 33,000-square-foot facility with 32 private long-term care rooms, a separate acute-care component and a multi-purpose space for community use. The project architect lists the project as in construction.

Until the Centre publishes opening and move dates, this page reports only what is confirmed. Every update posted here is dated, and questions can be directed to the Centre at any time.

Aerial architectural rendering of the new care centre, showing the wings, courtyards and covered main entrance

What is being built

A 32-room home with community space

32 private resident rooms

Each with its own private washroom, arranged as two 16-room long-term care wings.

Resident living and activity space

Dedicated living and activity areas alongside dining rooms served by a commercial kitchen.

A separate acute-care component

Treatment spaces, laboratory and X-ray, and medical, nursing and dietitian offices.

A community multi-purpose area

Space designed for community use within an approximately 33,000-square-foot facility.

Source: Project status and dates on this page are drawn from the project architect's published description and provincial reporting. They are shown as unconfirmed until St. Anne verifies the current schedule.

Project milestones

Timeline

  1. Facility replacement approved and designedPlanning and designComplete
  2. Site preparationCompletedComplete
  3. Construction under wayReported in construction (project architect)In progress
  4. Opening and resident transitionDate to be confirmed by St. AnneUpcoming

Latest updates

Project updates

Staff publish construction and planning updates here from the Administration Console.

No updates published yet

The first project update will appear here. In the meantime, call the Centre for the current construction status.

Construction gallery

Watching it go up

Dated site photographs will be posted as the build progresses, each with a plain-language caption.

Aerial construction photograph of the new St. Anne Centre site in Arichat, with foundations being poured and the Isle Madame coastline in the background
Construction progress·Foundations being poured on the Arichat site, overlooking the water and islands of Isle Madame.

Resident & family transition

How the move will work

Nothing changes today

Residents continue to live in the current home, with the same care team, until the new building is ready and licensed.

Written information first

Families will receive written information and a family meeting well before any move date, including room assignments and what to pack.

Questions are welcome now

You do not have to wait for an announcement. Call the Centre or raise it at Resident or Family Council.

To be confirmed

Move dates, room assignment process and transition supports have not been published by St. Anne. They will be added here once confirmed.

Community engagement

A community project, again

The multi-purpose space in the new building is designed for community use, continuing a pattern that began when residents of Isle Madame and Louisdale raised the money for the original hospital.

The Auxiliary continues to fundraise for resident comfort and equipment, and volunteers remain part of daily life through the transition.

Project questions raised at the Annual General Meeting and at Council meetings are answered publicly and summarised on this page.

Community updates also appear on the Centre's Facebook page; anything material is repeated here so the website stays the record of the project.

Project documents

What is on the record

Planning documents that mention the replacement facility live in the public document library.

  • By-Laws (approved & signed, June 19, 2025)

    June 2025

  • Strategic Plan 2024–2027 (one-pager)

    December 2024

  • Strategic Plan Board Oversight — supporting document 2024–2027

    December 2025